the periodic testing and inspection requirements for megcs are specified in 6.7.5.12. megcs or their elements shall not be charged or filled after they become due for periodic inspection but may be carried after the expiry of the time limit.

adrbook.com - Copyright all rights reserved. © 2015-2018