closed cryogenic receptacles shall be subject to periodic inspections and tests in accordance with the
periodicity defined in packing instruction p203 (8) (b) of 4.1.4.1, in accordance with the following:
(a) check of the external condition of the receptacle and verification of the equipment and the
external marks;
(b) the leakproofness test.