equivalent procedures for conformity assessment and periodic inspection and test

for un pressure receptacles the requirements of 6.2.2.5 and 6.2.2.6 are considered to have been
complied with when the following procedures are applied:
 

procedure

relevant body

type approval (1.8.7.2)

xa

supervision of manufacture (1.8.7.3)

xa or is

initial inspection and tests (1.8.7.4)

xa or is

periodic inspection (1.8.7.5)

xa or xb or is

 
xa means the competent authority, its delegate or inspection body conforming to 1.8.6.2, 1.8.6.4,
1.8.6.5 and 1.8.6.8 and accredited according to en iso/iec 17020:2012 (except clause 8.1.3) type a.
xb means inspection body conforming to 1.8.6.2, 1.8.6.4, 1.8.6.5 and 1.8.6.8 and accredited according
to en iso/iec 17020:2012 (except clause 8.1.3) type b.
is means an in-house inspection service of the applicant under the surveillance of an inspection body
conforming to 1.8.6.2, 1.8.6.4, 1.8.6.5 and 1.8.6.8 and accredited according to en iso/iec
17020:2012 (except clause 8.1.3) type a. the in-house inspection service shall be independent from
design process, manufacturing operations, repair and maintenance.